Dumas Contracting Ltd.
5. Development Miners Galleon Gold -West Cache Project
Job Description
Dumas Mining – Development Miner
Position: Development Miner
Project: Galleon Gold – West Cache Gold Project
Rotation: 14/14
Shift: 12 Hour shifts
Wage: $67.00 – $81.50/HR
Potential Compensation: KPI / Retention Bonus – Referral Bonus
Travel/Accommodations/Meals: Per Site Specific Allowance
About the Role
As a Development Miner with Dumas, you will perform underground development activities such as drilling, blasting, scaling, and installing ground support. You’ll operate and maintain equipment like jumbos, bolters, and scoops, ensuring compliance with safety protocols, and conduct routine checks and maintenance.
Key Responsibilities
- Perform underground development activities including drilling, blasting, scaling, and installing ground support.
- Operate and maintain mining equipment such as jumbos, bolters, and scoops.
- Ensure compliance with Dumas and site safety...